 ====== List of active Projects ====== ====== List of active Projects ======
  
-This topic shows you a list of active key projects of IT D-BAUG.+This topic shows you a list of active key projects of IT D-BAUG. ​You can also see completed projects here: [[projects:​completed:​index|Completed Projects]]
  
 +===== System Health Monitoring Solution =====
  
 +A D-BAUG global monitoring platform to check the health state of all kind of computer systems and network components will be implemented.
  
 ===== ID Printing Service (PiA) ===== ===== ID Printing Service (PiA) =====
Line 11: Line 13:
 ===== Managed Workstations ===== ===== Managed Workstations =====
  
-D-BAUG Stab and Bauwelt ​need to gain a better management level of the client computer infrastructure:​+D-BAUG Stab and BAUWELT ​need to gain a better management level of the client computer infrastructure:​
  
-A study about how to design a service for managed workstations has to be done to draw a basic concept for best practice. Typically it includes knowledge picked up during the Bauwelt ​Brush-Up.+A study about how to design a service for managed workstations has to be done to draw a basic concept for best practice. Typically it includes knowledge picked up during the BAUWELT ​Brush-Up.
  
 The following classes of managed workstations (and the corresponding typical user) have to be considered: The following classes of managed workstations (and the corresponding typical user) have to be considered:
  
-  - **Scientifc ​Workstation**+  - **Scientific ​Workstation**
      * High computing power, high-end hardware setup      * High computing power, high-end hardware setup
      * Special peripheral devices      * Special peripheral devices
Line 41: Line 43:
 [[projects:​manged_workstations:​index|Project Documentations (only for Project Members)]] [[projects:​manged_workstations:​index|Project Documentations (only for Project Members)]]
  
 +===== Datacenter Network Zone Migration =====
  
-===== Unified Ticket System =====+Due to a new network infrastructure that covers all regular server housing locations at ETH, we need plan and perform the to migrate our server VPZ by VPZ to the new DC zone. Advantage is, that the new datacenter network components are fully redundant. The new Datacenter network zone spans over all server locations, failover setups between Campus and Center can be made with the same layer 2 network.
  
-To improve problem and incident management, a trouble ticket system has to be implemented on a departmental level. +[[projects:dc-network-migration:index|Migration State for each DMZ]]
- +
-[[projects:unified_ticket_system:index|Project Documentations (only for Project Members)]]+
  
 ===== Virtualization ===== ===== Virtualization =====
Line 54: Line 55:
 [[projects:​virtualization|Project Documentations (only for Project Members)]] [[projects:​virtualization|Project Documentations (only for Project Members)]]
  
-===== Communication Platform for local IT experts ===== 
  
-To sustainably improve and optimize the communication between the IT specialists within the department, several communication platforms have to be implemented.  ​ 
  
  
Line 69: Line 68:
 We evaluate and introduce an information screen solution for central screens as well as screens run by institutes. We evaluate and introduce an information screen solution for central screens as well as screens run by institutes.
  
-Further we are involved in the project to reconstruct the entrance area in the HIL building to integrate a modern ​infos screen solution.+Further we are involved in the project to reconstruct the entrance area in the HIL building to integrate a modern ​info screen solution.
  
 [[projects:​infoscreen:​index|Project Documentations (only for Project Members)]] [[projects:​infoscreen:​index|Project Documentations (only for Project Members)]]
  
-===== IT Strategie 2025 =====+===== Color Switcher ​===== 
 + 
 +<​html>​ 
 +<a href="​javascript:​(function()%7Bswitch%20(document.body.id)%20%7Bcase%20%22brown%22%3A%20%20document.body.id%20%3D%20%22red%22%3B%20break%3Bcase%20%22red%22%3A%20%20%20document.body.id%20%3D%20%22blue%22%3B%20break%3Bcase%20%22blue%22%3A%20%20document.body.id%20%3D%20%22olive%22%3B%20break%3Bcase%20%22olive%22%3A%20%20document.body.id%20%3D%20%22grey%22%3B%20break%3Bcase%20%22grey%22%3A%20%20document.body.id%20%3D%20%22black%22%3B%20break%3Bcase%20%22black%22%3A%20%20document.body.id%20%3D%20%22turquoise%22%3B%20break%3Bcase%20%22turquoise%22%3A%20%20document.body.id%20%3D%20%22violet%22%3B%20break%3Bcase%20%22violet%22%3A%20%20document.body.id%20%3D%20%22brown%22%3B%20break%3Bdefault%3A%20document.body.id%20%3D%20%22brown%22%3B%20break%3B%7Ddocument.getElementsByClassName(%22login%22)%5B0%5D.innerText%20%3D%20document.body.id%7D)()">​Color Switcher</​a>​ 
 +</​html>​ 
 + 
 + 
 + 
 + 
 + 
 + 
 + 
  
-We are currently in the draft phase of writing a departmental IT Strategy to cover and implement the next 10 Years. 
  
  
-[[projects:​completed:​index|Completed Projects]]